Dimensions change
Cold or hot planks change size slightly and return to normal after settling. Laying before that leaves gaps or pushes against walls.
The boxes of parquet or rolls of vinyl arrived today and the fitters are ready tomorrow. Do you open the boxes and start laying straight away? For most materials the answer is no. Planks that have come from a warehouse, a van or a site at a different temperature and humidity need time to settle into the room, or gaps, cupping or bubbles can show up weeks later. Here we explain how, why and when, and what is specific to Riyadh’s climate.


Wood products, laminate, vinyl and other manufactured materials expand and contract with heat and humidity. Planks come from a warehouse or van in conditions different from your room, and if laid straight away they are still adjusting.
Cold or hot planks change size slightly and return to normal after settling. Laying before that leaves gaps or pushes against walls.
Wood parquet and laminate absorb moisture from the air. Planks from a damp place can shrink after fitting in an air-conditioned, dry room.
Planks left in a car in the sun differ in temperature from an air-conditioned room and need time to equalise.
Vinyl roll that has not relaxed tends to curl, and may show as bubbles or raised edges.
Settled planks are easier to lay and cut, and their joints close up more accurately.
Many manufacturers’ instructions require acclimatisation and skipping it may affect how problems are handled later. Check the product guide before starting.
The method is much the same for most materials, but the details and the time differ between products. The golden rule: read the manufacturer’s instructions. We follow them and apply them at your site.
The product should settle inside the room where it will be fitted, not in the garage or warehouse. That way the planks’ temperature and moisture match the real room.
In Riyadh air conditioning runs most of the year. The room should be at its normal temperature during settling and fitting, not in hot or damp building-site conditions. This matters especially in newly finished villas.
Boxes are stored flat and raised off the floor on battens or pallets, not leaned against walls and not exposed to sun. Boxes are opened as the manufacturer instructs.
Manufacturers’ instructions usually give a period from one day to several days, and some materials need longer. We rely on what is written in the guide for the product we fit, and agree the date with you in advance.
| Key point | What we do | |
|---|---|---|
| Laminate and HDF parquet | Affected by humidity and temperature | We leave it in the air-conditioned room for the period the product instructions give |
| Solid wood parquet | Very sensitive to moisture | Needs more attention to subfloor moisture and close reading of the product guide |
| SPC and plank vinyl | Less affected but responds to heat | We leave it in the room for a suitable time so it matches the room temperature |
| Roll vinyl | Tends to curl from the roll | We unroll and let it relax before cutting and gluing |
| Roll carpet | Relaxes a little after unrolling | We unroll it and leave it before stretching and fixing |
| Artificial grass | The roll keeps its rolled shape | We unroll and let it relax before seams and cutting |
This is general guidance, not a substitute for the product’s instructions. We read the guide at supply and follow it.
Riyadh’s dry, hot climate means some overseas acclimatisation advice needs adapting to local reality, though the basic rule does not change.
Dry air means planks can lose moisture after fitting if they came from a humid place, leaving small gaps. That is why we want wood to settle in the final room conditions with its normal air conditioning.
Leaving boxes in a car or on an open roof heats the planks unevenly. Put them in shade inside the building as soon as they arrive. For more on sun see sunlight and floor fading.
Fresh plaster gives off moisture for weeks. Planks settled in a damp room and then laid over a damp floor can cup. See concrete subfloor moisture testing.
If the site is hot during works, we wait until the building settles to its usual temperature before starting. This sometimes delays the date, but it protects the floor.
The ideal case is material that arrives two days early, an empty air-conditioned room and fitters waiting. Reality is usually more complicated, and these situations come up repeatedly.
When flooring arrives and then finishing is delayed by weeks, do not leave it in an unfinished room. Store it flat in a closed, dry place out of the sun, then settle it again in the final room for a suitable period before fitting.
Painting gives off moisture and dust. We prefer wet trades to finish before the floor comes in, otherwise we wait until the air dries. See flooring before or after painting.
We clear the room concerned and put the boxes in it with the air conditioning running, then work room by room. This lets the planks settle gradually without disrupting the whole home.
On big projects we spread boxes over several rooms or floors according to the programme and avoid stacking the whole quantity in a room that may not hold it. See flooring supply for contractors.
When we supply and fit the floor we plan this step from the first quote and do not leave it to installation week.
We rely on the manufacturer’s instructions for the specific product you buy, not a general rule. If the product changes, the period changes.
We set with the family or the contractor the day boxes enter the room and the day laying starts, so the time between is enough.
We confirm air conditioning, humidity and that the floor is dry. If conditions are not right we say so frankly and suggest a better date instead of gambling.
Ask for the product guide and learn the settling time and storage rules.
Bring the boxes into the room before fitting for the period required.
Run the air conditioning at normal living temperature before and during settling.
Make sure it is dry and level. See floor preparation.
Tell the fitters the arrival date so they start once the time has passed.
Most problems we are called to weeks after fitting can be traced to a skipped step.
Cold or hot planks will change after laying and leave gaps or swell. Wait the required period.
A garage is hotter or damper than the room, so planks are not settled once moved.
Sun heats one side of a box and distorts the planks.
It causes bowing. Keep them flat, level and on supports.
Each product has its own properties. We follow what the manufacturer wrote before any general habit.
Damp under a new floor can undo all the settling. Moisture testing is essential.
Do not change the air conditioning suddenly or leave windows open for long hours in the first week.
Expansion gaps at walls must stay free. See expansion gaps.
Delay very heavy furniture as the product instructions say.
If you notice lifting or an odd sound, photograph it and send it early. See vinyl bubbles and gaps.
The complete steps. See parquet installation Riyadh.
With the preparation needed. See vinyl installation.
Choosing the method. See glue-down or click.
After the work is finished. See handover inspection checklist.
Most benefit to different degrees: parquet and laminate are the most sensitive, while vinyl, carpet and grass need time to relax. The reference is the instructions of the product to be fitted.
It varies by product, usually from one day to several days according to the manufacturer’s guide. We read the guide and agree the period with you before the date.
The room where it will be fitted is best, with its normal air conditioning, because the aim is for the planks to match the real room conditions.
We do not advise it. Rushing may save days but can cause gaps or cupping that need treatment later. We prefer to keep to the period.
The product stays in the room under the same conditions and boxes stay closed and flat. A short delay usually does no harm, and we check the planks before starting.
Yes. We want the room’s temperature and humidity close to what they will be once lived in, so we prefer the air conditioning running during settling and fitting.
Yes. When we supply the material we coordinate its arrival with the fitting date, and when it comes from elsewhere we advise the right period. See flooring project steps.
Tell us the floor type, its arrival date and the room condition on WhatsApp, and we will arrange the settling period and fitting in Riyadh.
Understanding parquet specifications.
How to read vinyl specifications.
How to protect floors from site works.
Order of works in a new villa.
Ventilating after laying.
Send your room sizes and get an offer.
Carpet, rugs and underlay under parquet to soften noise.
Vinyl rolls and carpet tiles for contractors’ site offices, fitted fast.
Parquet, vinyl and rugs for developers’ galleries, fitted to schedule.
Signs of wear and how to choose between repair and replacement.
What we check in the free visit and how to prepare for it.
A phased work plan without moving out.