Measure at the widest point
Walls are not always perfectly parallel. Take the larger length and width so the quantity is not short.
Before asking for a vinyl quote you need a clear area figure, otherwise you will be comparing estimates that do not match. This page gives you a simple calculator that multiplies length by width and adds a waste allowance, then explains how to measure rooms, turn the area into packs or rolls and work out skirting. The figures are for planning, and we confirm them at the inspection before any final order.


Enter the room length and width in metres, choose a waste allowance, and you will see the area and the suggested order quantity (length × width, then the waste added). Repeat for each room and add the results together.
Accurate measuring saves you from excess waste and from running short halfway through fitting. Six simple rules follow, and for more detail see how to measure your floor yourself.
Walls are not always perfectly parallel. Take the larger length and width so the quantity is not short.
An L-shaped room becomes two rectangles; work out each area and add them.
Vinyl usually runs under the door frame to the middle of the threshold. Measure these parts and add them if they are outside the room rectangle.
Fitted wardrobes installed after the vinyl may not need flooring under them, but confirm this at the inspection.
Write the figures on a rough drawing of each room, which makes reviewing them with you easy.
Use metres throughout instead of mixing centimetres and feet, and convert before entering.
Waste is the part that does not end up in the finished floor but is needed to complete the job: cuts at the walls, small pieces at corners, boards damaged during fitting and sections set aside to match the pattern. So we do not order exactly the room area; we add a spare allowance.
A simple rectangular room with straight fitting needs less waste. The most common allowance is around ten per cent, while rooms with many corners, columns or planks with patterns that must match need more. This is a planning rule, and we confirm it after the inspection because room shape and fitting method decide the figure.
With vinyl roll waste depends on roll width and the shape of the room, and the roll may need to be cut in a certain way to limit seams. With SPC planks and similar, waste depends on plank length and fitting direction; see vinyl planks versus tiles for the formats.
A small shortfall at the end of fitting can mean ordering a new batch with a colour or pattern difference. It is safer to order the full quantity with waste and keep the leftovers for any later repair.
Estimate area, quantity and material cost from the per-metre price in your quote.
Send us the result with photos of the space and we will review it with you at an inspection in Riyadh before settling the final quantity.
| Case | Measurements | Area | Suggested quantity |
|---|---|---|---|
| Rectangular bedroom | 5 m × 4 m | 20 m² | 22 m² with 10% added |
| Simple lounge | 6 m × 4.5 m | 27 m² | 29.7 m² with 10% added |
| Small room | 3 m × 3 m | 9 m² | 9.9 m² with 10% added |
| Room with many corners | Two rectangles 4×3 and 2×2 | 16 m² | 18.4 m² with 15% added |
Record length and width at the widest point, with doorways and recesses.
Multiply length by width, and split irregular shapes into rectangles.
Choose an allowance suited to the room shape and fitting method, then add the areas.
Divide the quantity by the pack or roll coverage stated for the product you choose.
We check them with you at the inspection and correct any figure before ordering.
Vinyl planks are usually sold in packs, each pack covering a set number of square metres defined by the product. A roll is ordered by length with a fixed roll width. So do not simply multiply area by a price per metre; refer to the data of the product you choose.
Divide the suggested quantity by the coverage of one pack and round the result up to the next whole number. A purely illustrative example: if the quantity is 22 m² and one pack covers 2 m², you would need eleven packs. The actual coverage of the product is given to you when you pick it.
Ask which roll width is available, because you may need to cut along the room and join two pieces. See the vinyl roll page for details.
Skirting, transition profiles and underlay can be part of a quote, so also work out the room perimeter minus door openings. For more see skirting and profiles and underlay and insulation.
Guessing length and width by eye produces large errors. Use a tape measure.
Many people forget door thresholds and find the shortfall at the end. Add them from the start.
After fitting you may need a piece for a future repair. Keep some planks.
A calculator gives a planning figure only, and the inspection settles the final quantity.
Multiply length by width in metres to get square metres, then add a waste allowance. For irregular rooms, split them into rectangles and add the areas.
Around ten per cent is often added for rectangular rooms, and more for rooms with many corners or planks that need matching. This is a planning rule that the inspection confirms.
No. It gives area and suggested quantity only. Price depends on the type, thickness, fitting and existing floor, and we do not quote a figure before an inspection.
Yes if you will lay vinyl in them; see kitchen and bathroom vinyl.
We do not advise deducting movable furniture because it will move later. Fixed units are discussed at the inspection.
Divide the suggested quantity by the coverage of one pack as the product states, and round up.
Yes, waste and cutting differ. Rolls depend on roll width and planks on plank length and fitting direction.
It depends on the type and the condition of the floor; the details are on the underlay and insulation page.
It depends on the area and the condition of the floor and we do not quote a figure before inspection; see how long flooring installation takes.
Use the WhatsApp button under the calculator or contact us and send the measurements with photos of the space.
Send the area you calculated and we will review it with you before settling the quote.
A comparison to help you decide.
A specifications guide.
Quick steps to ask for an offer.
A flooring bill of quantities (BOQ) for projects in Riyadh: room areas, waste, skirting and underlay, and what to put in a tender. Ask us to…