Open daily 7 AM – 10 PMFree site inspection in Riyadh
Chat on WhatsAppCall us now · +966 55 725 1134
For contractors and engineering offices

Flooring Bill of Quantities for Projects in Riyadh — How to Calculate and Request Accurate Pricing

What most muddles flooring pricing on projects is an incomplete bill of quantities: areas with no waste, skirting left out, underlay forgotten and specifications vague. Here we explain how to build a BOQ for carpet, vinyl, parquet and artificial grass, and then help you review it and prepare a quote once we receive the drawings.

Shelves of flooring rolls ready for project supply
A board of mixed flooring samples for comparison on a project
Accurate quantities, accurate pricingWe review your BOQ against the specs
Free inspectionMeasure and subfloor check in Riyadh
Supply & fitIncluding skirting and profiles
Over tilesUsually no demolition needed
Open daily7 AM to 10 PM
BOQ items

What Should a Flooring Bill of Quantities Contain?

A good BOQ answers one question: what will be installed, where, in what quantity and to which specification? These are the six items we ask for on any project before pricing.

Areas by room

For each room or zone, its area in square metres and the floor type required there, grouped by floor and phase.

Floor type and specification

Carpet, vinyl, parquet or grass, with thickness, density or wear layer, pattern and any special requirement such as slip or fire resistance.

Waste and offcuts

An allowance for cutting and seams that varies by type and room shape, and it should be visible in the table, not hidden in the price.

Skirting and profiles

Measured in linear metres around room perimeters and at thresholds and transitions, and often forgotten in schedules.

Underlay and preparation layers

Moisture and sound underlay, levelling compound and adhesive, measured by area or by packs depending on the product.

Removal and preparation works

Removing an old floor, levelling or repairing cracks appear as separate items so they are not loaded onto the laying price.

Waste

How Is Waste Worked Out for Each Type?

Waste is not a fixed figure. It changes with the type, the room shapes and the fitting method. These are general guidelines for a first calculation, and the final figure is set after studying the drawings.

Carpet

Roll carpet loses material in cutting depending on roll width and room dimensions, and waste can rise in small or irregular rooms. Carpet tiles waste less, mostly at the edges. See the carpet roll waste calculator.

Vinyl

Click-lock SPC planks need waste allowance for plank direction and room ends. See the vinyl quantity calculator.

Parquet

Straight planks waste less than patterns such as herringbone, which need more setting out. See the parquet quantity calculator.

Artificial grass

Rolls are cut to width and length, and seams and edges need their own allowance. Use the artificial grass quantity calculator.

A simple model

A Simple Model for Organising the BOQ

Suggested columns for a flooring BOQ and how to fill them
ColumnWhat it holdsNote
ZoneRoom or hall name and the floorMakes it easy to tie to the drawing
Area (m²)Length × width for each zoneTotalled per floor type
Floor typeProduct, specification and patternWritten clearly to avoid pricing differences
Waste %An allowance suited to the typeAdjusted after studying the drawings
Skirting (lm)Skirting length around the perimeterMeasured in linear metres
Underlay and materialsLayers, adhesive and compoundBy area or by pack
NotesRemoval, levelling or special requirementsDo not hide these among other items

More guides and services you may find useful

Send Your BOQ or Drawings for Review

On WhatsApp send the drawings or the schedule of areas and specifications and we will review them with you and prepare the quote.

Open daily 7 AM – 10 PMServing Riyadh city
A worked example

A Simple Worked Example for One Room

This is a teaching example with assumed numbers to explain the idea only. It is not a price and not an approved waste figure.

Area

A room 6 m long and 4 m wide has an area of 6 × 4 = 24 m².

Waste

If we provisionally assume 10 percent waste, the quantity needed is 24 × 1.10 = 26.4 m². The real figure is set by floor type and room shape.

Skirting

The room perimeter is 2 × (6 + 4) = 20 linear metres, less door widths where skirting does not run. This figure goes into the skirting item, not the floor area.

Totalling

Areas are totalled per floor type and ancillary materials are added as separate quantities. You can use the calculator below to enter each room’s dimensions and send us the result.

Estimate a zone area

Estimate a Room’s Area and Waste to Enter in the Table

Enter the room length and width to see the area with a suggested waste allowance, then send the result on WhatsApp. Repeat for every zone in your project.

0Area (m²)
0Suggested order (m²)
Send these sizes and ask for a price
Pricing request

Steps to Preparing a Quote with Tiraz Najd

  1. Send the drawings

    Floor plans or an area schedule and the required specifications.

  2. Review quantities

    We check areas, waste and skirting and raise questions.

  3. Propose products

    We suggest products that match the specification and show samples.

  4. Quote

    A detailed quote with items, quantities and supply terms.

  5. Schedule supply

    We agree delivery in line with the project programme.

Common mistakes

Mistakes That Keep Appearing in BOQs

Forgetting skirting and trims

They turn up as a surprise cost at the end of installation if not listed from the start.

Taking areas from drawings without measuring

A difference between drawing and site changes the quantities, so measure on site before the final order.

Vague specifications

A phrase like “good vinyl” is not enough; state thickness, wear layer and pattern.

Price factors

What Decides Flooring Prices in a Tender?

We do not quote figures on this page. These are the factors that explain differences between similar quotes.

Specification

A difference between two products in thickness, wear layer or density changes the price.

Quantity

Large quantities are priced differently from small ones, and standardising the product affects that.

Supply schedule

Supply in stages or to tight dates can change the terms.

Installation

Whether the quote is supply only or supply and fitting, and which works are included.

Preparation materials

Underlay, compounds, adhesive and skirting appear as separate or grouped items.

Site and access

Difficult access to floors or sites can affect execution.

For tenders

Tips When Putting Flooring Out to Tender

If you are a contractor or a consultant preparing a tender document, these points reduce disputes later.

Ask for samples before approval

Approving a physical sample prevents disagreement between contractor and owner over colour and feel.

Allow product equivalents

Permit equivalent products with written specifications rather than tying the tender to one product, which widens competition.

Set acceptance criteria

Agree beforehand how the floor will be inspected at handover. See the floor handover inspection checklist.

Tie delivery to stages

Floors come after many other works, so link supply dates to progress stages rather than a fixed date. See floor protection during construction.

Questions About Flooring Bills of Quantities

What is a flooring BOQ?

It is an organised list of areas, specifications and quantities for each floor type in a project, used to price supply and installation and to track execution.

How much waste should I add?

It varies by floor type, room shape and fitting method, and is set after studying the drawings. No single figure suits every case.

Do I need to count skirting separately?

Yes. It is measured in linear metres around room perimeters and is a separate item or grouped with the floor depending on the contract terms.

Can you review a BOQ prepared by the contractor?

We can review quantities and specifications and give notes before pricing, pointing out what may be missing or need clarifying.

Do you provide samples for approval?

We show samples of shortlisted products for comparison and approval, and we arrange this when you contact us.

Do you price supply and installation together?

Supply only or supply with installation can be priced to suit your project scope, and we make this clear in the quote.

How do I send the project drawings?

Send them on WhatsApp or discuss a more suitable way with us, and we will reply after review with what we need to prepare the quote.

Request a Quote for Your Project After a Quantity Review

Call or message us on WhatsApp with the drawings or area schedule and we will review them with you.

Open daily 7 AM – 10 PMServing Riyadh city

More guides and services you may need

Call nowChat on WhatsApp